|
LIST YOUR DAYCARE! FIND A DAYCARE! |
|
|||||||
| Daycare Center and Family Home Forum Daycare Center and Family Home owners, Directors, Operators and Assistants should post and ask questions here. |
![]() |
|
|
Thread Tools | Display Modes |
|
#1
|
||||
|
||||
|
How many hours a day/week/month do you consider 1/2 time?
How many hours a day/week/month do you consider fulltime? If a parent needs a day/week where they will go into full time how do you charge them for that? Especially if you do a flat rate for billing? Also how would you change this if you are using MM for billing? |
|
#2
|
||||
|
||||
|
3 set days is p/t and they have to be set if they rotate they need a f/t opening
4 days at the p/t rate is the same as my f/t rate so they often go f/t so they can come for preschool that day |
|
#3
|
|||
|
|||
|
Part time is anything less than 5 hours per day or 2 full days per week.
|
|
#4
|
||||
|
||||
|
I do part time: 5-30 hours, full time 30-50 hours. Anything 0-5 hours is considered "babysitting" and is charged higher.
|
|
#5
|
||||
|
||||
|
PT is 3 days per week or less for me.
|
|
#6
|
||||
|
||||
|
I don't do half days, so that makes it easier for me.
Part time care is 3 or fewer days a week and is billed at $120/week flat rate. Full time care is 4 or more days a week and is billed between $150-200/week flat rate depending on the contracted hours (child that's picked up at 3pm daily is $150...child that's picked up at close is $200/week). I don't charge by the day or by the hour. I always have a contract assigning a weekly flat rate. If a parttimer wishes to use 4 days in one week then they would pay the full time flat rate geared to their pick up time. |
|
#7
|
||||
|
||||
|
I charge by the hour but thinking of going to a flat day rate. Here are my families and times.
My part-timers I think are the ones that hang me up the most. FULLTIMERS DCF #1=6:30-3:45 (sometimes till 4:30/4;45) DCF #2=7:30-4:15/4:30 DCF#3=7:45-5:15/5:30 PART-TIMERS DCF#4=6:45-5:00-one day a week (two other days 6:45-2;00)(Sometimes a fourth day with variable hours) DCF#5=8;15-2:45-Four days a week(sometimes needs me till 4:45)(Some weeks needs me a fifth day) This is why sometimes when I have the kids more I make way more money because of charging by the hourly rate. If I were to go to a flat rate I would do a flat rate per day, no less then 3 days. I'm not sure though if I want to mess with part-time rate though because of all the fluctuating hours. My two part-times both need me about 24-26 hours but if they need the extra hours it automatically bumps them into full time. If I were to do a flat rate per day then they could add the extra days without their rate changing but just add an extra day on. Hope that makes sense. ![]() So do you think it fair to charge my part-timers the same as my full-timers? |
|
#8
|
||||
|
||||
|
Full-time care- Child can be in care a maximum of 10 hours a day and no more than 50 hours a week. Rate: $***.**/week per child
Part-time care- Child can be in care a maximum of 10 hours a day and no more than 25 hours a week. Rate: $**.**/week per child. Not sure how to help you with the varying schedules you have though. I do know that when I went to a flat rate charge I had a huge load taken off my shoulders. |
![]() |
| Thread Tools | |
| Display Modes | |
|
|